• Case Studies

  • More than 60 kits of ProJoint V75-WT used for a stunning stone labyrinth

    The time involved in the team sizing and placing each limestone sett to their exacting standards was extensive.  ProJoint V75-WT was trialled on a test area for the aesthetics as well as a saving on labour time. Using over 60 kits meant this fabulous feature was jointed far quicker than by using traditional pointing methods, with the added advantage of remaining weed free and frost resistant.

    Mark of Graduate Gardeners commented "It was the first time that we used ProJoint V75-WT but it was the perfect solution for pointing the Labyrinth, quick and easy to use, the lads on site were really impressed.  I would thoroughly recommend!"